Beijing Qinrunze Environmental Protection Technology Co., Ltd.

Actors focused on environmental pollution control

Manufacturer from China
Verified Supplier
2 Years
Home / Products / Process Design /

Process Package Provides Construction Drawings, Design Sewage Treatment Equipment, Environmental Protection Industry

Contact Now
Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Visit Website
City:beijing
Province/State:beijing
Country/Region:china
Contact Person:MrFrank He
Contact Now

Process Package Provides Construction Drawings, Design Sewage Treatment Equipment, Environmental Protection Industry

Ask Latest Price
Video Channel
Brand Name :QRZ
Model Number :Construction drawings
Place of Origin :China
MOQ :1
Price :¥350-¥5000
Payment Terms :D/P, T/T
Supply Ability :1 per week
Delivery Time :10-90 working days
Packaging Details :NONE
Delivery date :10-90 working days
Delivery form :Delivery of PDF drawings
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Process Package Provides Construction Drawings, Design Sewage Treatment Equipment, Environmental Protection Industry


Provide process technical support:
Drawings: Design drawings for various specialties, including architecture, structure, process, electrical control, HVAC, fire protection, water supply and drainage, etc. (Professional optional)
Drawing content:
1. Architectural drawings include cover, table of contents, design specifications, overall layout, individual floor plans, elevations, sections, and structural details.
2. Content of structural drawings: cover, table of contents, design specifications, overall layout, floor plans and cross-sections of each building, structural drawings of beams, slabs, columns, pool walls, and bottom plates, detailed drawings of each component, reinforcement table, etc.
3. Process drawing content: cover, table of contents, design specifications, building layout plan, equipment layout plan, instrument layout plan, pipeline layout plan, elevation process/PID process/process flow diagram, section/elevation diagram, axonometric drawing (construction drawing), partial installation detailed drawing (construction drawing), material list, equipment and instrument list, etc.
4. Electrical self-control drawing content: cover, table of contents, design description, floor plan (cabinet box layout, bridge layout, power wiring, self-control wiring, lightning protection, grounding, lighting, etc.), load calculation table, IO table, cabinet/box drawing, schematic diagram, self-control system diagram, equipment material list, etc.
5. Other professional drawings: executed according to professional requirements.
Service standards:
1. Depth: For municipal engineering projects, the preliminary design documents meet their depth requirements; For non municipal projects, the depth shall be based on the preliminary design documents of municipal public works. 2. Time: Complete the preliminary design within the specified time. 3. Quality: The content is comprehensive and in-depth, with the latest standards, regulations, and laws adopted. The process and design parameters are in line with the actual water quality of the project, and the structural building electrical design meets the process and actual operational requirements; There are no mandatory clauses that violate mandatory requirements such as "should, must, and should not". 4. Cost: Meet the depth and quality requirements of design budget preparation; Cost and cost fully consider market conditions and customer needs. 5. Provide drawing versions of various professional design descriptions
6. Responsible for designing various specialties to meet the construction requirements of the owner
7. Provide drawings for each specialty (optional for each specialty)
8. Provide a list of drawing versions
9. Provide a budget proposal (optional).

What the customer needs to provide:
1. Planning the red line
2. Feasibility study and approval documents
3. Environmental impact assessment and approval documents
4. Preliminary design and approval documents
5. Scope, pool structure, implantation equipment or process units, level of content detail, and other requirements
6. Brand requirements/models/data/drawings for equipment and instruments
7. Time requirements

Plan duration and delivery format:
1. Delivery time: 10-90 working days
2. Delivery form: Delivery of PDF drawings

Fee standard:
1. The starting fee is 10000 yuan.
2. Charge 1-3% of the total investment according to the plan. Fees below 2 million yuan are charged at 3%; 2-5 million, charged at 2.5%; 5-10 million, charged at 2.0%; 10 to 30 million yuan, charged at 1.5%, and over 30 million yuan charged at 1.0%; Set a complexity coefficient of 0.7-2.0 for difficulty and adjust the charging ratio based on the project.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the above foundation.
5. The construction drawing budget is calculated based on market prices.



Inquiry Cart 0